|
Setting ID
|
Settings Name
|
Description
|
||
|---|---|---|---|---|
|
SET001
|
Batch Size for FCO Search Results
|
This setting indicates the maximum number of records that are qualified and considered per each batch by the FCO Search Results Batch Process, based on the search criteria defined in the FCO Wizard for the purpose of generating FCO Result Lines.
|
||
|
SET002
|
Batch Size for FCO Work Order Creation
|
This setting indicates the maximum number of FCO search results that can be considered per batch for the Work Order Generation Batch Process.
|
||
|
SET003
|
Maximum number of FCO Search Results generated per FCO
|
This setting indicates the maximum number of FCO search results that can be generated when the user performs an FCO Search within the FCO Wizard. If the estimated search results exceed this defined maximum, the “Run Now” button in the FCO Wizard will be disabled.
|
||
|
SET004
|
Custom Field Replacement for Search of Complex Serial/Lot Numbers
|
When performing an FCO search on the ‘Serial/Lot Number’ field using string operators, complex alphanumeric values with differing lengths may return inaccurate results. Orgs may standardize their serial number value lengths by introducing a custom field with appropriate character padding. Indicate the custom field in this setting, and the FCO Search will automatically reference the field when performing a search on ‘Serial/Lot Number,’ using any string operator.
Values: API name of the custom field
Default Value: None
|
||
|
SET005
|
Placeholder character for padding Serial/Lot Number Values
|
When a custom field is indicated in SET004, a placeholder character for padding the standardized Serial/Lot number values must be indicated here. This is necessary so FCO Search can properly perform the search. Please select the special character that will be used to pad the values in the custom field. NOTE: only the listed special characters are recognized for padding at this time.
Values: !, #, $, 0
Default Value: !
|
||
|
SET006
|
Length of Custom Field Replacement with Placeholder Padding
|
When a custom field is indicated in SET004 and a placeholder character is indicated in SET005, this setting must be populated with the intended length of the custom field with padding. This is necessary so FCO Search can properly perform the search. Please input the number length of the custom field when using the placeholder character as padding.
Values: Any number
Default Value: None
|
|
Setting ID
|
Settings Name
|
Description
|
||
|---|---|---|---|---|
|
SET001
|
Enable Output Generation from Wizard
|
Enables users to generate output delivery records from the Assign to Field Change Order Wizard step on the Installed Product record.
By default, this is set to False.
|