
|
|
• The FCO Creation Wizard includes an admin setting for defining the maximum number of results allowed to search for a single FCO. If your defined search returns an estimated number that exceeds the configured maximum, then the Run Now button is disabled preventing you from performing the search. For your reference, the maximum search result value is displayed.
• Additionally, if your defined search returns an estimate of zero results, the Run Now button is disabled preventing you from performing the search.
|
|
Field
|
Description
|
|---|---|
|
Installed Product
|
The list of Installed Products defined in the FCO Search screen.
|
|
Serial Number
|
The serial number of the Installed Product, serialized stock, and batch lot.
|
|
Batch Lot
|
The batch lot number of the Installed Product.
|
|
Location
|
The location of the Installed Product and serialized stock.
|
|
|
The Results Preview table displays only the first five records of the search, sorted in ascending order of serial number found.
|
|
|
You can choose to exit the FCO Creation Wizard at this stage. However, If you remain in the FCO Creation Wizard, your screen updates to display the progress status as the search executes in the back end.
|